Material Removal Rate
MRR estimates how much material is being removed per minute. It is useful for cycle-time planning and horsepower estimation.
Formula
MRR = WOC × DOC × IPM
Where:
- WOC = width of cut
- DOC = depth of cut
- IPM = feedrate
Why it matters
Higher MRR can improve throughput, but only if spindle power, rigidity, and tool life stay in range.