Lockout / Tagout
Standard sequence
- Prepare for shutdown
- Shut the equipment down
- Isolate all energy sources
- Apply locks and tags
- Verify zero-energy state
- Perform the work
Zero-energy verification is the step that operators skip at their own risk. Always try to start after isolation to confirm the machine cannot energize.